

One photo is the front door, and the other is the east side. The decking lumber will go on in the spring, or when ever it stops raining for a while.
This blog will feature the progress of construction of the Olin vacation home on the McKenzie River, Oregon. The construction was begun in May of 2006.
No comments:
Post a Comment